Why Legacy MPLS Contracts Inflate UK Multi-Site WAN Spend
Legacy MPLS networks charge steep per-megabit port premiums while backhauling cloud traffic through central data centres. Replacing MPLS with Dedicated Internet Access (DIA) and Managed SD-WAN typically reduces 3-year recurring connectivity spend by 30% to 45% while increasing site bandwidth five- to ten-fold.
- Carrier-Agnostic Underlay Sourcing: Rather than locking every branch into a single incumbent carrier, ManagedByUs aggregates Openreach EAD, CityFibre, Virgin Media Business, and Colt circuits under one unified SLA.
- Openreach EAD Delivery Windows: Standard single-bearer 1Gbps circuits typically provision in 60 to 90 working days following site survey, whereas RO2 dual-exchange diverse circuits require 90 to 120 working days due to separate duct routing and local exchange engineering.
- ECC & Wayleave Mitigation: Rural industrial estates and multi-tenanted city blocks can trigger Excess Construction Charges (ECCs) and landlord wayleave delays. We deploy pre-staged 5G/FTTP interim connectivity so sites go live on day one while civil fibre works complete.