Enterprise WAN & Connectivity Engineering

Enterprise WAN TCO &Leased Line Lead-Time Estimator

Model the 36- and 60-month Total Cost of Ownership (TCO) of replacing legacy carrier MPLS with hybrid SD-WAN over Dedicated Internet Access (DIA). Forecast UK Openreach EAD delivery lead times and Excess Construction Charge (ECC) risks across single-bearer and RO2 diverse topologies.

Loading WAN TCO & Lead-Time Estimator...

Why Legacy MPLS Contracts Inflate UK Multi-Site WAN Spend

Legacy MPLS networks charge steep per-megabit port premiums while backhauling cloud traffic through central data centres. Replacing MPLS with Dedicated Internet Access (DIA) and Managed SD-WAN typically reduces 3-year recurring connectivity spend by 30% to 45% while increasing site bandwidth five- to ten-fold.

  • Carrier-Agnostic Underlay Sourcing: Rather than locking every branch into a single incumbent carrier, ManagedByUs aggregates Openreach EAD, CityFibre, Virgin Media Business, and Colt circuits under one unified SLA.
  • Openreach EAD Delivery Windows: Standard single-bearer 1Gbps circuits typically provision in 60 to 90 working days following site survey, whereas RO2 dual-exchange diverse circuits require 90 to 120 working days due to separate duct routing and local exchange engineering.
  • ECC & Wayleave Mitigation: Rural industrial estates and multi-tenanted city blocks can trigger Excess Construction Charges (ECCs) and landlord wayleave delays. We deploy pre-staged 5G/FTTP interim connectivity so sites go live on day one while civil fibre works complete.

Migrate from legacy MPLS with zero branch downtime

Contact ManagedByUs today. We provision carrier-diverse DIA leased lines, orchestrate Managed SD-WAN overlays, and back every site with 24/7 UK NOC telemetry and a 15-minute critical response SLA.